The Materials Handling Experts...

H. & T. Labour and Vacuumation Services Ltd

H.& T.’s experience is extensive and is constantly growing as new projects are taken on across industry.

Projects

Text Box: Emptying Process Cyclone
65m above ground, hot, semi-solidified powder.
Text Box: Emptying Road Tanker - semi-solidified powder, confined space entry.
Text Box: Emptying a fluidised sand bed furnace ready for a maintenance inspection
Text Box: Clean up chalk slurry spillage and jet out drains system

Besides those featured below other projects include:

 

· Cleaning of large multi-hearth incinerator for CHP plant at coffee factory.

 

· Emptying bulk product silos to allow new specification material to be put in.

 

· Viscous sludge removal from settlement ponds.

 

· Major chain replacement in wet process cement kilns.

 

· Emergency clean ups after bulk powder transport failures.

 

· 24h clean up programs to support major maintenance shutdowns in both cement and steel industries.

 

· Emptying process hoppers after incorrect raw materials had been used.

 

· Clean up in pulverised fuel plant to allow maintenance overhaul to take place.

 

· Emptying a flour storage silo after water ingress had damaged product.

 

· Combined vacuum truck and manual labour task force to break up hard cement build ups and remove spilt powder.

 

· Vacuum removal of heavy sludge and silt from water treatment works.

 

· Cleaning of build up from waste incinerator flue ductwork.

 

· Site clearance of contaminated process material after serious industrial accident.

 

If you have a cleaning, spillage, recycling or material recovery problem… call us we may just have the answer you’ve been waiting for…..

 

 

 

Text Box: Emptying Tertiary Air Duct on Cement Kiln- Furthest suction point 95m from truck..
Text Box: Combination of 8” flexible hose, aluminium pipes and 6” flexible hose used to reach the work area 40m above the ground with minimum pressure drop
Text Box: Cement Kiln TA Duct
Text Box: Cement Kiln Preheater Cyclone

Video

Clip

Text Box: Road Tanker Ferrous Sulphate
Text Box: Fluidised Sand Bed Furnace
Text Box: Cement Kiln - Cooler Plate Cleaning
Text Box: Solidified and Slurried Chalk

Video

Clip

Text Box: Rapid removal of dust and lumps.  Large lumps broken down with a sledge hammer then vacuumed up.
Text Box: Storage Dome Roof Seal Cleaning
Text Box: Removal of dust that had accumulated in a flexible seal between the top of the wall and the roof - causing partial failure of the seal.  Working height 30m , circumference of store 175m.